The project TR Beroun – Renewal of Transformer Station no. IE-12-6004102 dealt with revamping of the existing transformer station. The scope of project included an outside substation R 110kV, common operation building (BSP), new covered substation and protection houses, three sheltered sites for transformers and choking coils, internal asphalt road and rain sewage for roof drainage of new and existing buildings and hard surfaces.
The scope of Contract for Work included PS 10 - 22 kV substation, PS 30.4 – Optic network, PS66 – Station optic cable, SO 340 – External lighting and SO 521.1 – Sheltered LV substation
Performance: October 2019 – November 2021