Detail of HV 110kV switchboard installation, control cabling |
Installation of protection relay cabinets |
Performance: 1.1.2020 – 04/2022
Substation 110kV – 27 switchgear bays
Control cabinets including protection – 27 pieces
Complete construction of switchgears of unit auxiliaries
Back-up battery power supply including inverters
Adjustments of protection in powered units PCH, R200, R700, RAP
Complete air-conditioning and heating system of the new substation and unit auxiliaries including battery unit
Complete lighting of the new substation and unit auxiliaries
Construction of new routes for VHV and LV cabling including VHV and LV cables
Installation of terminals and VHV connections
Building of GIS and auxiliary units
By-pass of existing networks
|
Installation of VHV metal-enclosed switchgear |
First supplies of VHV ABB GIS |
|
Construction of steel structures and jacketing |
Foundation concreting |