Performance project documentation for instrumentation. Complete supply of equipment, cabling, cable routes including installation works. Supply of equipment: pressure transmitters, pressure difference transmitters, level gauges, temperature sensors, closing valves, control valves, orifices, etc.; transition boxes, electrical trace heating, fireproof glands. Installation and assembly works, individual & complex tests, putting into operation
Performance project documentation for electrical equipment, instrumentation, air-conditioning, EPS and construction parts (substation). Supply of lighting, routes, cabling, new LV switchgears. Construction of LV substation. Installation and assembly works, individual & complex tests, putting into operation
Project documentation for building permit. Performance project documentation for electrical equipment, instrumentation, air-conditioning, EPS, machinery and construction parts. Supply of 6kV FC, 6kV motors. Supply new LV switchgears, cable connections. Construction of LV substation. Installation and assembly works, individual & complex tests, putting into operation
New HV switchgear located in the new service transformer station was connected from the exiting LV network using new cable loop (PS 01 – service transformer station CV_0139 – technological part; new HV switchgear Siemens, type 8DJH, specification KKT installed into the station; new cable loop connected with T-connectors 22kV CTS630A)
HV underground line
Existing HV underground line 3x 22-AXEKVCE 1x240mm2 between DTS CV_1100 Klášterec-Pivovar and CV_0739 Klášterec-Lidl shopping centre was cut in the ground; new cable loop made of underground line VN 3x 22-AXEKVCE 1x240mm2 was connected to the existing HV cable by new direct cable joints POLJ24/1x120-240
Construction of new compact transformer station with internal operation, type BEK 300/420 replacing the dismantled compact transformer station as scheduled, including by-pass of LV and HV cabling
Existing HV cabling 22kV, type 3x1-22kV-AVXEKVCE 1x240mm2 between the transformer station CV_0748 – U kolejí, CV_0765 – Dopravní podnik (Transport company) and CV_0767 – Shopping Centre were marked on the area plot no.625/2, sufficiently excavated and cut; new HV cables 22kV, type 3x1-22kV-AXEKVCE 1x240/25mm2 led in new route into the site of the new compact transformer station with internal operation BEK 300/420 by company TECHCO were connected in the connection site XS1 by cable joints POLJ-24 and terminated in the HV substation 8DJH KKKT by company SIEMENS using T-connectors CTS 630A 24/95-240/EGA/CZ